CyBe Robotic 3D Concrete Printer Context

Specifications

  • Installation Time: 6-9 months from order to shipment, with a 10-day operator training course
  • Print Speed: Wall elements for a Lyve design printed within 2-3 days; 24 h of hardening before elements are hoisted; manholes printed in 1-2 h
  • Architecture: CyBe Chysel slicing software generates the toolpath; CyBe Artysan software controls the machine and records print statistics
  • Material Summary: CyBe Mortar sets in 3-5 min for robot-line printing and 15-40 min for the gantry line; mortar production emits up to 32% less CO2 than Portland cement

View CyBe Robotic 3D Concrete Printer overview