Verified Events
DateTypeCompanyHeadlineSegment

Gecko Robotics partners with Anduril on inspection automation for Arsenal-2
- Anduril says Gecko's non-destructive testing technology is already being embedded in production workflows and integrated with ArsenalOS at the 160,000-square-foot California facility.
- The partners intend to transfer these quality processes to the planned Arsenal-2 shipyard in Maryland, with digital inspection records following components through their service lives.
- Gecko reports inspection timelines for forged components have fallen by up to 90% in work with other defence-industrial customers.

ugo and Seibu Railway set permanent substation inspection pilot
- The pilot runs from October 1, 2026 through March 31, 2027 at Seibu’s Ikebukuro electrical substation.
- ugo mini will capture video and temperature data while testing reductions in inspection travel and labour.
- The platform combines autonomous navigation, 4K imaging, 3D LiDAR and AI meter reading; ugo reported cumulative shipments above 100 units in March 2026.