BladeBUG completes first offshore turbine blade walk
BladeBUG completed the first robotic blade walk on an offshore wind turbine at ORE Catapult?s Levenmouth Demonstration Turbine.

Evidence notes
- The six-legged robot repeatedly scaled blades over two days in mid-October.
- The demonstration used ORE Catapult?s 7MW Levenmouth offshore turbine.
- The robot walked 50 metres on a vertically positioned blade.