Twenty-eight-day Angola geophysics campaign concludes

Mar 4, 2020 · Deployment · Ocean Infinity · Maritime

Ocean Infinity completed a 28-day Total E&P Angola campaign that acquired geophysical, geotechnical and seismic data in parallel from one surface vessel.

The Angola campaign combined geophysical, geotechnical and seismic acquisition in one 28-day cruise and one surface vessel, an evidenced integration of survey modes rather than an ROV deployment claim.

Ocean Infinity company media
Company media · Ocean Infinity
  • The campaign acquired geophysical, geotechnical and seismic data simultaneously from one surface vessel.
  • Multiple AUVs operated alongside geotechnical and seismic equipment during a single 28-day cruise.
  • The work covered Blocks 32 and 17 from the host vessel Normand Frontier.